Disaster masters
Petr & Odessa Skvaril
Job of the month - December 2017
This structural drying job in Tasmania was caused by a busted pipe in the ceiling wetting all the walls, flooring and ceilings.
A great job for the Drymatic equipment: 4x Drymatic Boost Bars and a Drymatic II were installed.
The Drymatic II was installed to pull the dry air from outside into the machine and to exhaust the wet air out the bathroom window. The Drymatic II Y piece kit was installed to split the room intake and to lower the relative humidity in multiple areas.
The Drymatic Boost Bar with its revolutionary PTC heater putting out more energy the larger the airflow was helping to heat the surfaces. This resulted in greater evaporation potential.
This was both Petr and Odessa’s first Drymatic job. So they video phoned Garry Carroll the owner of Drymatic Heat Drying Australia to help them through every step of the job.
This particular job has resulted in more work from the insurance loss adjuster as this job really blew him away.